             Enter total length of 9 inch thick wall  | 
          x 1/10 x  | 
          | 
         | 
         | 
      
       
        |  
             Enter total length of 4 inch thick wall  | 
           x 1/10 x  | 
          | 
         | 
         | 
      
      
        | Cement - Number of bags
         |      
          | 
          | 
         | 
         |     
      
      
        Sand - Approx 6 loads of 300 cubic feet each for 1000Sft Brick house 
        Approx 5 loads of 300cft each for 1000Sft Concrete Block house.Price Rs.100 per cft.Varies in each | 
          | 
          | 
         | 
         | 
      
      
        | Steel - Approx 2000Kg for 1200sft Slab area with 12 columns | 
         | 
          | 
         | 
         | 
      
       
        Flooring Vitrified Tiles & wall Tiles   Approx 1200sft for 1200Sft Built Up Area | 
         | 
          | 
         | 
         | 
      
      
        Flooring Labour for Vitrified Tiles & wall Tiles   Approx Rs.15/- per Sft For Granite Flooring it is 40/- per Sft | 
         | 
          | 
         | 
         | 
      
      
        Powder Coated Alluminiun Sliding windows. Approx 200Sft area of window for 1200Sft House  Wooden window use same area but multiply with rate per Sft for wooden windows)  | 
         | 
          | 
         | 
         | 
      
       
        | Main door & Pooja door in Teak wood 50 Sft at 1000Rs per Sft  | 
          | 
          | 
         | 
         | 
      
      
        | Other 6 doors of total area 120Sft with ready made doors at Rs.250/- per Sft  | 
          | 
          | 
         | 
         | 
      
      
        Bathrooms - Bathroom Fittings.  Approx 15000/- Per Bathrom  | 
          | 
          | 
         | 
         | 
      
      
        Plumbing Material -   Approx Rs.60/- per Sft of Built Up Area | 
         | 
          | 
         | 
         | 
      
      
        Plumbing Labour Cost -   Approx Rs.8000/- per bath room | 
         | 
          | 
         | 
         | 
      
      
        Electrical Material   Approx Rs.60/- per Sft of Built Up Area  | 
         | 
          | 
         | 
         | 
      
       
        | Electrical Work labour Cost Approx Rs.15/-per Sft of Built Up Area | 
          | 
          | 
         | 
         | 
      
      
        Painting Material   Approx Rs.40/- per Sft of Built Up Area (Asian Paints Tractor Emulsion And Apex) | 
          | 
          | 
         | 
         | 
      
      
        Painting Labour   Approx Rs.50/- per Sft of Built Up Area (Two coat Putty & 2 Coat Paint) | 
          | 
          | 
         | 
         | 
      
      
        Gate & Grill   Approx Rs.50/- per Sft of Built Up Area | 
         | 
          | 
         | 
         | 
      
      
        | Centering & Bar Bending labour Cost Approx Rs.50/-per Sft | 
         | 
          | 
         | 
         | 
      
      
        | Civil Work labour Cost Approx Rs.350/-per Sft | 
          | 
          | 
         | 
         | 
      
  
      
        | Miscellaneous Cost Approx Rs.50/-per Sft | 
          | 
          | 
         | 
         | 
      
  
      
        
        | 
           
          |  | 
       Total cost of Construction  | 
         | 
      
     
       
        | 
          | 
          | 
        Total cost of per square feet of Built up area is |      
         
        
         |